From first call to finished shower
No surprises. Here is how it goes, from your first call to the final walk-through, so you know what to expect.
From first call to finished shower
Six simple steps. There is no pressure at any point.

Dawson reaches out with a cost idea
Call or text Dawson at (513) 582-6048 for a rough idea of cost, or try the price tool on this site at your own pace. No pressure either way.
Chris comes out to measure
Chris visits your home, measures, shows you samples and answers your questions. You decide what you like, and you decide how fast we go.
- Sample quoteFor illustrationRemove existing tub or shower and haul awayShower pan and wall systemNew valve, showerhead and handheldGrab bar, niche or seat, as you chooseCleanup and final walk-throughTotal
You receive your quote from Dawson
Dawson puts your quote together and sends it to you. Take your time with it. Compare it with others if you like.
You accept, and we order your materials
When you are ready to go ahead, we order your wall panels, shower pan and fixtures.
We get you on the schedule
We pick an install date that works for you and let you know what to expect.
Derek and Randy arrive and install
Our installers arrive, protect your home and build your new shower. Installs typically take about two days.
Install day, step by step
Installs typically take about two days. Every bathroom is a little different.
- 1Arrival
Derek and Randy arrive
They go over the job with you and confirm the materials.
- 2Protect your home
Drop cloths go down
Drop cloths protect your floors and the path through your home. We also locate your main water shut-off. It helps if you already know where yours is.
- 3Demo
Out with the old
We remove the old tub or shower and haul the debris out to our trailer.
- 4Plumbing
New plumbing, all of it
We open up access to the plumbing and run all new plumbing.
- 5Repairs
Needed repairs
We make the repairs that need making, such as the subfloor or a small amount of mold. Anything beyond our scope needs a professional, and we will tell you plainly if we see something like that.
- 6Day 1 test
Leak test before we close it up
We test the plumbing for leaks on day one, before the shower pan goes in and before the walls go up.
The final walk-through
We run the shower with you and confirm there are no leaks. Then you ask us anything you like.
When can I shower?
Typically about 24 hours after we finish. We will confirm for your shower before we leave.
Protecting your home
- Drop cloths down before work starts
- Old materials hauled away to our trailer
- We clean inside, and outside if we made a mess, before we leave
“I highly recommend Blessed Bath Co. to replace an old tub and shower with a walk in shower. They were very responsive to our needs and the price was right. Derek and Randy did a great job and it took less than a day and a half to accomplish this feat.”
“1. On time 2. Clean on arrival and departure 3.Great communication 4. Do exactly what was promised”
“They did a nice job on my shower. Done in a timely manner. They were respectful of my home cleaning up afterwards. Easy to work with. Communicated well.”